Construction Bid Withdrawal Rules: Complete Guide to Withdrawing Bids
Learn the rules for withdrawing construction bids. Understand when withdrawal is allowed, clerical error claims, bid bond implications, and how to avoid costly mistakes.
Bid Withdrawal Overview
Sometimes contractors need to withdraw bids due to errors, changed circumstances, or discovered mistakes. The rules differ significantly depending on whether withdrawal occurs before or after bid opening—and the consequences can be severe.
Why Bid Withdrawal Matters
Submitting a bid creates a legal obligation. Public agencies rely on bids being firm to ensure fair competition. Improper withdrawal can result in:
- Bid bond forfeiture: Loss of 5-10% of bid amount
- Debarment: Being banned from future bidding
- Lawsuit: Agency may sue for damages
- Reputation damage: Word spreads in the industry
Withdrawal Before Bid Opening
Generally Permitted
Withdrawing a bid before the official bid opening is typically allowed without penalty. The bid hasn't been publicly opened, so no harm is done to the competitive process.
Typical Process:
- • Submit written withdrawal request
- • Request must be received before bid opening time
- • Identify the project and your bid
- • Agency returns sealed bid package
- • Bid bond is released
Timing Is Critical
The withdrawal must be received before the scheduled bid opening time—not just sent. Allow time for delivery and processing. Electronic systems may have specific cutoff rules.
Withdrawal After Bid Opening
Much More Difficult
Once bids are publicly opened, withdrawal becomes extremely difficult. Your bid is now part of the public record and the agency has relied on it for the competitive process.
Withdrawal may be allowed only if:
- • A material clerical error occurred (not judgment error)
- • Error is clearly evident from the bid documents
- • Bidder acts promptly upon discovering error
- • Agency hasn't yet awarded the contract
- • Withdrawal won't unduly harm the agency
What Doesn't Qualify
- ✗Errors in judgment (underestimating costs)
- ✗Market changes after bid submission
- ✗Finding a better project opportunity
- ✗Subcontractor backing out
- ✗Realizing you can't do the work
Clerical Error Claims
What Constitutes a Clerical Error
A clerical error is a mechanical mistake—not an error in judgment. Examples include:
May Qualify:
- • Transposed numbers ($1,250,000 vs $1,520,000)
- • Misplaced decimal point
- • Math errors in extensions
- • Omitting a bid item entirely
- • Double-counting quantities
Won't Qualify:
- • Underestimating labor costs
- • Wrong material pricing
- • Insufficient markup
- • Missed scope items
- • Bad subcontractor quotes
Proving a Clerical Error
To support a clerical error claim, you'll typically need to provide:
- • Original workpapers and spreadsheets
- • Evidence showing where the error occurred
- • Explanation of how error happened
- • Calculation of correct bid amount
- • Declaration under penalty of perjury
Bid Bond Implications
When Bid Bonds Are Forfeited
If you withdraw improperly or refuse to execute the contract after award, the agency can make a claim on your bid bond:
- • Bond amount: Typically 5-10% of bid
- • Damages: Usually difference between your bid and next lowest
- • Maximum: Limited to face value of bond
- • Surety impact: May affect future bonding capacity
Your Surety Matters
If you need to pursue withdrawal, involve your surety company early. They have experience with these situations and may help negotiate with the agency.
Withdrawal Procedures
1. Act Immediately
If you discover an error, notify the agency as soon as possible. Delay weakens your position and may be seen as waiting to see if you win.
2. Submit Written Request
Prepare a formal written request explaining the error, providing supporting documentation, and requesting withdrawal or correction.
3. Provide Evidence
Include original workpapers, spreadsheets, subcontractor quotes, and any other documentation that shows the error was clerical, not judgmental.
4. Consider Legal Counsel
For significant amounts, consult an attorney experienced in construction law. The rules vary by jurisdiction and agency.
Preventing Bid Mistakes
Quality Control Checklist
- ✓Review all math with a calculator—don't trust spreadsheet formulas blindly
- ✓Have a second person check all numbers before submission
- ✓Compare total to engineer's estimate—big differences warrant review
- ✓Verify all subcontractor quotes are current and complete
- ✓Check that all addenda are incorporated
- ✓Don't rush—allow time for thorough review
- ✓Use standardized estimating procedures
Frequently Asked Questions
Can I withdraw if my subcontractor backs out?
Generally no. Subcontractor issues are considered part of business risk. You may have recourse against the subcontractor, but you're still obligated on your bid.
What if I'm the only bidder?
Agencies may be more willing to allow withdrawal if it won't affect competition. However, they're not required to—the same rules technically apply.
How long do I have to withdraw after opening?
Act immediately upon discovering the error. Most jurisdictions require prompt action— waiting even a few days weakens your position significantly.
Will withdrawal affect my ability to bid future work?
It can. Improper withdrawals may result in temporary or permanent debarment. Even allowed withdrawals create a record that agencies may consider.
Bid with Confidence
BidFinds helps contractors find the right opportunities and bid effectively.
Start Finding Bids →Ready to Find Your Next Contract?
Get instant access to thousands of government construction bids with our AI-powered platform.
Get Started